Understand the UK public sector market like never before with Tussell Insight.
Book a demoSources
Tenders Electronic DailyFramework value
£3.6BNumber of suppliers
0Count of identified call-offs
167Value of identified call-offs
£2.72BHighways England continues to roll out the asset delivery model to its operational areas. There is a requirement to deliver a range of renewal, improvement and selected small scheme construction works on the Strategic Road Network in areas utilising specialist contractors working collaboratively with Highways England to deliver these works. It is envisaged that this framework will straddle two Road Investment Strategy (RIS) periods (RIS 2 and RIS 3) enabling a smooth transition between them. Works for schemes have been divided...
Highways England continues to roll out the asset delivery model to its operational areas. There is a requirement to deliver a range of renewal, improvement and selected small scheme construction works on the Strategic Road Network in areas utilising specialist contractors working collaboratively with Highways England to deliver these works. It is envisaged that this framework will straddle two Road Investment Strategy (RIS) periods (RIS 2 and RIS 3) enabling a smooth transition between them. Works for schemes have been divided into a number of workstreams that align with the contractors' specialisms, and will also include design. Bandings have been introduced into the framework model to differentiate some contracting terms between bands.
Contract status | Not awarded, procurement discontinued |
Value |
£3.6B
|
Contract can renew | No |
Contract type | Works |
Contract sectors |
|
Contract locations |
|
Contract has EU funding | No |
Contract suitable for SME | No |
Contract suitable for VCO | No |
Contract notice published | 7 August 2020 |
Contract tender deadline | 10 September 2020 |
Contract start | - |
Contract end |
- |
Contract duration | 6 years |
Contract value awarded |
-
|
Contract awarded |
Unknown (no dates available)
|