Understand the UK public sector market like never before with Tussell Insight. Book a demo of the full platform now

Closed Contract notice

Swindon Borough council (the Employer), wishes to submit to tender the requirements for the provision of the design and installation for upgrading approx. 28,000 street lights throughout the Borough of Swindon to LED and the provision of a Central Management Software (CMS), some column replacements and column sleeving may be required as part of these works. These works are to create energy efficiency savings for the Local Authority. Priority is to generate the maximum cost savings as early in the contract as is possible. The...

Swindon Borough council (the Employer), wishes to submit to tender the requirements for the provision of the design and installation for upgrading approx. 28,000 street lights throughout the Borough of Swindon to LED and the provision of a Central Management Software (CMS), some column replacements and column sleeving may be required as part of these works. These works are to create energy efficiency savings for the Local Authority. Priority is to generate the maximum cost savings as early in the contract as is possible. The contract start date is scheduled to commence 19/09/2019 with a contract period of 10 years (2 years design and build and 1 year defect period. The software will be for a total of 10 years to include licencing and maintenance support). The design and mobilisation is expected to commence on contract award. The licences for the software will be novated at the end of the defect period to Swindon Borough Council. The estimated budget range for this opportunity is between £7 100 000 and £8 500,000 GBP. Please note that this has been previously advertised however the tender return date has been extended to 23/08/2019.

Read more...

Contract status:

Contract notice - closed

Contract value:

£7.1M - 8.5M

Contract can renew:

No

Contract type:

Works

Contract sectors:

  • Road equipment
  • Industry specific software package
  • Road equipment
  • Industry specific software package

Contract location:

  • South West
  • South West

Framework contract:

No

Contract suitable for SME:

Yes

Contract suitable for VCO:

No


Contract notice published:

5 August 2019

Contract tender deadline:

23 August 2019

Contract start:

2 October 2019

Contract end:

2 October 2022

Contract duration:

3 years