Book a demoNEUPC is looking to establish a framework agreement which is for the provision of data centre management equipment and infrastructure products and related services. NEUPC intends to award up-to the 7 top ranked bidders to the framework, see the ITT document for full details. The purpose of the framework agreement is to provide Institutions and participating Consortia members with a framework for the supply, installation and management of data centre management equipment and infrastructure plus related design and consultancy....
NEUPC is looking to establish a framework agreement which is for the provision of data centre management equipment and infrastructure products and related services. NEUPC intends to award up-to the 7 top ranked bidders to the framework, see the ITT document for full details. The purpose of the framework agreement is to provide Institutions and participating Consortia members with a framework for the supply, installation and management of data centre management equipment and infrastructure plus related design and consultancy. Products in scope include a range of data centre management equipment and infrastructure including but not limited to Uninterrupted Power Supplies (UPS), cooling equipment, generators, gas and fire suppression systems, power distribution units (PDU’s), blanking panels, caging. Any or all elements of the supply, Installation, and management of data centre equipment and infrastructure may be bought via the framework. See ITT.
Contract status | Tender notice - closed |
Value |
£30M
|
Contract can renew | No |
Contract type | Supplies |
Contract sectors |
|
Contract locations |
|
Contract has EU funding | Yes |
Contract notice published | 16 October 2019 |
Contract tender deadline |
14 November 2019
Add bid deadline date to your calendar: |
Contract start | - |
Contract end |
- |
Contract duration |
4 years
|