Understand the UK public sector market like never before with Tussell Insight.
Book a demoSources
Tenders Electronic DailyFramework value
£8.7BNumber of suppliers
16Count of identified call-offs
5Value of identified call-offs
£817MThis notice confirms award of the Delivery Integration Partner (DIP) framework to 13 suppliers (this includes 2 joint ventures, making 15 companies in total).
To support delivery of the UK Road Investment Strategy (RIS1 and RIS2 https://www.gov.uk/government/collections/road-investment-strategy), DIPs will design and construct highway projects across England under NEC4 standard terms, with suitable amendments. The term will be from 2018 to 2024.
The framework is divided into 8 lots, with each lot having a specific value...
This notice confirms award of the Delivery Integration Partner (DIP) framework to 13 suppliers (this includes 2 joint ventures, making 15 companies in total).
To support delivery of the UK Road Investment Strategy (RIS1 and RIS2 https://www.gov.uk/government/collections/road-investment-strategy), DIPs will design and construct highway projects across England under NEC4 standard terms, with suitable amendments. The term will be from 2018 to 2024.
The framework is divided into 8 lots, with each lot having a specific value threshold for work packages and covering a defined geographical area. Lots 1 to 3 (Band A) are for work packages not exceeding £100m, lots 4 to 8 (Band B) are for work packages exceeding £100m. Candidates who applied in lots 1 to 3 were not permitted to also apply in lots 4 to 8.
Successful DIPs are guaranteed an initial package of work under each lot with subsequent contracts being allocated either on a direct award basis or under mini-competition, which may include the suppliers appointed to all lots.
DIPs will undertake the following:
Support Project Control Framework (PCF) Stage 2: specialist advice on planning and buildability; and where instructed Investigative and intrusive surveys.
Accountable for PCF stages 3-7: Responsible for the detailed design and construction of designated project. Managing their designers to produce optimum solutions, in-house resource and specialist supply chain to construct scheme, ensuring scheme is delivered to time, cost and performance outcomes. The DIP will act as the Regional integrator between Highways England (HE), Technical Advisor Partner, DIP supply chain and key stakeholders to deliver an integrated solution. With specialisms including but not limited to Preliminary design; Specialist advice on the whole-life costing and future maintenance/inspection requirements and provisions; Development of collaboration arrangements; Supply Chain Strategy; Development of progress approvals and planning consents and DCOs; Buildability and Value Engineering reviews; Risk management; Development of HandS, Environmental and Quality plans for executing works; Construction and commissioning of enabling and construction works; Principal Contractor and Principal Designer under CDM duties; Revision and agreement of final account; Defects rectification and aftercare; Hand over asset; Strategic Programme Office related services: Planning and production strategy; Regional Procurement strategy and materials logistics plan; Commercial management; Digital platform transformation; Skills and capability strategy to minimise regional skills gap; Performance Management Office; Health, Safety and Welfare. Other duties as instructed by the Project Manager.
Supplier name |
City |
Region |
Country |
SME |
---|---|---|---|---|
Alun Griffiths (Contractors) Limited | Wales | Wales | No | |
Amey OW Limited | London | London | United Kingdom | No |
Balfour Beatty CE Limited | London | United Kingdom | No | |
Balfour Beatty Civil Engineering Limited | London | London | United Kingdom | No |
Bam Nuttall Limited | South East | United Kingdom | No | |
CARDO (SOUTH) LIMITED | Cardiff | Wales | Wales | No |
COSTAIN GROUP PLC | South East | United Kingdom | No | |
GALLIFORD TRY INFRASTRUCTURE LIMITED | Edinburgh | Scotland | Scotland | No |
JOHN GRAHAM CONSTRUCTION LIMITED | Hillsborough | Northern Ireland | Northern Ireland | No |
KIER TRANSPORTATION LIMITED | Salford | North West | United Kingdom | No |
NMCN PLC | North West | United Kingdom | No | |
Northstone (NI) Limited | Northern Ireland | Northern Ireland | No | |
Sir Robert Mcalpine Limited | East Of England | United Kingdom | No | |
Skanska Construction UK Limited | Watford | East Of England | United Kingdom | No |
VINCI CONSTRUCTION UK LIMITED | Watford | East Of England | United Kingdom | No |
Volkerfitzpatrick Limited | East Of England | United Kingdom | No |
Contract status | Framework - awarded |
Value |
£8.7B
|
Contract can renew | No |
Contract type | Works |
Contract sectors |
|
Contract locations |
|
Contract has EU funding | No |
Contract suitable for SME | No |
Contract suitable for VCO | No |
Contract notice published | 28 December 2018 |
Contract tender deadline | 28 June 2018 |
Contract start | 19 November 2018 |
Contract end |
18 November 2024 Add contract end date to your calendar |
Contract duration | 6 years |
Contract value awarded |
£14.7B
|
Contract awarded |
Between 19 November 2018 and 5 December 2018
|